


RAL Color Living Room Filing Cabinets KD Structure
Model:FC-M5
- Material:Cold Rolled Steel With Electrostatic Powder Coating
- Size:W900*D400*H1850mm /CUSTOMIZED
- MOQ:50PCS
- Shipping Port:Qingdao Port
- Business Type:B2B
- Product Description
- Accessories & Packing
- QC System
PRODUCTS ADVANTAGES
1. Accept OEM&ODM
2. Skillful workmanship, green product, environmental-friendly
3. Sturdy construction, wear resistance, high load-bearing.
4. Easy to install, clean, and maintain
5. Knockdown structure, space-saving, and save cost
6. Adopts electrostatic epoxy powder spraying, durable and anti-rust
7. Samples and a trial order are available
SUPPLY ABILITY AND TRADING TERMS
Terms of payment
1.T/T,30% deposit in advance, the balance upon the B/L copy
2. Small quantity for trial orders allowed
3. Production Ability 20000sets/month
4. We offer OEM and ODM services.
Lead-time
1. Peak time15-30days, leisure time 20-30days after receiving your deposit
Packing:
Inner packing: polyfoam and pearl cotton between each separate part;
Outer packing: standard five layers carton.
One piece in one master carton.
APPLICATION
Office / School / Home / Hotel / Hospital / Company / Factory






Main Technical Parameters
Size |
W900*D400**H1850mm |
Structure |
Knock Down |
Packing Volume |
0.131cbm |
Raw Material |
Cold Rolled Steel |
Thickness |
0.5mm-0.9mm |
Surface |
Electrostatic Powder Coating |
MOQ |
50pcs |
Color Options |
RAL,Pantone,Customized |
MATERIALS AND COLOUR




PACKAGE





Step 1 Pre-assembling before painting
In the sheet metal workshop, when sheet metal part is finished, QC department will assemble the metal parts and check size, edge,welding point,bending,integral assembly effect etc.

Step 2 Powder coating test
After panting,the painting group will check powder uniformity, surface flatness ,chromatic aberration etc. Unqualified parts will not have a chance to go to the next stage.

Step 3 Assembling before packing
After painting but before packing, QC department will assemble all the parts again to do the comprehensive inspection, including structure, size, accessories, color etc.

Step 4 Spot check in warehouse
Before loading, QC department will do the random inspection for the products in the warehouse, ensure the quality again before products leave factory.
- Related Products