steel office furniture suppliers steel office furniture suppliers phone

PRODUCTS CENTER

RAL Color Living Room Filing Cabinets KD Structure

Model:FC-M5


  • Material:Cold Rolled Steel With Electrostatic Powder Coating
  • Size:W900*D400*H1850mm /CUSTOMIZED
  • MOQ:50PCS
  • Shipping Port:Qingdao Port
  • Business Type:B2B

  • Product Description
  • Accessories & Packing
  • QC System

PRODUCTS ADVANTAGES

1. Accept OEM&ODM
2. Skillful workmanship, green product, environmental-friendly
3. Sturdy construction, wear resistance, high load-bearing.
4. Easy to install, clean, and maintain
5. Knockdown structure, space-saving, and save cost
6. Adopts electrostatic epoxy powder spraying, durable and anti-rust
7. Samples and a trial order are available

 


SUPPLY ABILITY AND TRADING TERMS
Terms of payment
1.T/T,30% deposit in advance, the balance upon the B/L copy
2. Small quantity for trial orders allowed
3. Production Ability 20000sets/month
4. We offer OEM and ODM services.
Lead-time
1. Peak time15-30days, leisure time 20-30days after receiving your deposit

Packing:

Inner packing: polyfoam and pearl cotton between each separate part;
Outer packing: standard five layers carton.
One piece in one master carton.


APPLICATION
Office / School / Home / Hotel / Hospital / Company / Factory

 

 

 

 

 

Main Technical Parameters

Size

W900*D400**H1850mm

Structure

Knock Down

Packing Volume

0.131cbm

Raw Material

Cold Rolled Steel

Thickness

0.5mm-0.9mm

Surface

Electrostatic Powder Coating

MOQ

50pcs

Color Options

RAL,Pantone,Customized

MATERIALS AND COLOUR

PACKAGE

Step 1 Pre-assembling before painting

In the sheet metal workshop, when sheet metal part is finished, QC department will assemble the metal parts and check size, edge,welding point,bending,integral assembly effect etc.

Step 2 Powder coating test

After panting,the painting group will check powder uniformity, surface flatness ,chromatic aberration etc. Unqualified parts will not have a chance to go to the next stage.

Step 3 Assembling before packing

After painting but before packing, QC department will assemble all the parts again to do the comprehensive inspection, including structure, size, accessories, color etc.

Step 4 Spot check in warehouse

Before loading, QC department will do the random inspection for the products in the warehouse, ensure the quality again before products leave factory.

  • Related Products
Wood Top Office Desk

Wood Top Office Desk

Wood Top Office Desk

Wood Top Office Desk

Wood Top Office Desk

Wood Top Office Desk

Wood Top Office Desk

Wood Top Office Desk

REQUIRED *

OPTIONAL