Open Book Shelf Filing Cabinet
Model:FC-018
- Size:W900*D400*1850mm /CUSTOMIZED
- MOQ:30
- Packing Volume:0.131cbm
- Thickness:0.5mm-0.9mm
- Structure:Knock Down
- Raw Material:Cold Rolled Steel
- Surface:Electrostatic Powder Coating
- Business type:B2B
- Product Description
- Accessories & Packing
- QC System
Main Features
● Shelf: Large range of adjustment
● Reinforcing rib: Welded on back of shelves and top panel ,better stabilizes every part and whole structure
● Standard Configuration: Four shelves
● Lock: Cyber Lock from Thailand
● Application: Office, School,Government,Hotel etc
● Delivery Time: 30days after payment
● Certificates: ISO9001, ISO14001, OHSAS18001, China Environmental Labelling
● Thickness of painting: 60μm
● Packing Method: flat packed,foam board,foam paper,standard 5 layers carton,packing straps
● Warranty: 5 years
Main Technical Parameters
Size |
W900*D400*1850mm |
Structure |
Knock Down |
Packing Volume |
0.131cbm |
Raw Material |
Cold Rolled Steel |
Thickness |
0.5mm-0.9mm |
Surface |
Electrostatic Powder Coating |
MOQ |
50pcs |
Color Options |
RAL,Pantone,Customized |
MATERIALS AND COLOUR
PACKAGE
Step 1 Pre-assembling before painting
In the sheet metal workshop, when sheet metal part is finished, QC department will assemble the metal parts and check size, edge,welding point,bending,integral assembly effect etc.
Step 2 Powder coating test
After panting,the painting group will check powder uniformity, surface flatness ,chromatic aberration etc. Unqualified parts will not have a chance to go to the next stage.
Step 3 Assembling before packing
After painting but before packing, QC department will assemble all the parts again to do the comprehensive inspection, including structure, size, accessories, color etc.
Step 4 Spot check in warehouse
Before loading, QC department will do the random inspection for the products in the warehouse, ensure the quality again before products leave factory.