





Mini Safe Box
Model:CBNT-SF-17E
- Size:W230*H170*D170mm
- MOQ:30PCS
- Packing Volume:0.014CBM
- Thickness:Door 2.5mm & Body 1.5mm
- Structure:Assembled
- Raw Material:Cold Rolled Steel
- Surface:Electrostatic Powder Coating
- BUSINESS TYPE:B2B
- Product Description
- Accessories & Packing
- QC System
Main Features
1. CE&ROHS Approved
2. High quality electronic lock : 3-8 digit user codes plus mechanical override keys
3. 2 Chrome plated solid steel locking bolts
4. Automatic locked for 5 minutes when 3 times fault password is input
5. Protective Floor Mat
6. 4 x AA batteries included, low battery warning
7. 4 pre-drilled anchor bolt holes, fixing kits supplied for anchoring to wall or floor, top opening for cash and coin
8. User manual included
9. Surface treatment: Powder coating against rust or corrosion
10. Two types: have hole on the top/ no hole on the top
11. 7 colors: white, black, red, gold, blue, pink, green
12. Door thickness:2.5mm // Body thickness:1.5mm
13.Usually load 1650pcs in 1X20GP
● Application: Office,Home,Hotel etc
● Delivery Time: 30days after payment
● Thickness of painting: 60μm
● Packing Method: Assembled structure,foam board,foam paper,standard 5 layers carton,packing straps
● Warranty: 5 years












Main Technical Parameters
Size |
W230*H170*D170mm |
Structure |
Assembled |
Packing Volume |
0.014cbm |
Raw Material |
Cold Rolled Steel |
Thickness |
Door 2.5mm & Body1.5mm |
Surface |
Electrostatic Powder Coating |
MOQ |
30pcs |
Color Options |
RAL,Pantone,Customized |
MATERIALS AND COLOUR




PACKAGE





Step 1 Pre-assembling before painting
In the sheet metal workshop, when sheet metal part is finished, QC department will assemble the metal parts and check size, edge,welding point,bending,integral assembly effect etc.

Step 2 Powder coating test
After panting,the painting group will check powder uniformity, surface flatness ,chromatic aberration etc. Unqualified parts will not have a chance to go to the next stage.

Step 3 Assembling before packing
After painting but before packing, QC department will assemble all the parts again to do the comprehensive inspection, including structure, size, accessories, color etc.

Step 4 Spot check in warehouse
Before loading, QC department will do the random inspection for the products in the warehouse, ensure the quality again before products leave factory.
- Related Products