steel office furniture suppliers steel office furniture suppliers phone

PRODUCTS CENTER

Modern RAL Color 2 Door Metal Wardrobe

Model:CC-MS


  • Size:W900*D450*1850mm/CUSTOMIZED
  • MOQ:50
  • Packing Volume:0.131cbm
  • Thickness:0.5mm-0.9mm
  • Structure:Knock Down
  • Raw Material:Cold Rolled Steel
  • Surface:Electrostatic Powder Coating
  • Business Type:B2B

  • Product Description
  • Accessories & Packing
  • QC System

Main Features

●   Hanging bar: Could hang clothes or towels, etc

●   Shelf: Put on the needed things

●   Mirror: With a mirror inside the door

●   Inner door with lock: Private space

●   Cushion: Use a high-quality plastic cushion to avoid crashes and protect the door

●   Strengthening rib: Protect the door from being out of shape surface

●   Bolt: Connect the door and the frame, easy to be assembled


Lock: Cyber Lock from Thailand
Application: Office, School, Workshop, Hotel, etc
Delivery Time: 30days after payment
Certificates: ISO9001, ISO14001, OHSAS18001, China Environmental Labelling
Thickness of painting: 60μm
Packing Method: flat packed, foam board, foam paper, standard 5 layers carton, packing straps
Warranty: 5 years

 

 

 

 

 

Main Technical Parameters

Size

W900*D450**H1850mm

Structure

Knock Down

Packing Volume

0.131cbm

Raw Material

Cold Rolled Steel

Thickness

0.5mm-0.9mm

Surface

Electrostatic Powder Coating

MOQ

50pcs

Color Options

RAL,Pantone,Customized

MATERIALS AND COLOUR

PACKAGE

Step 1 Pre-assembling before painting

In the sheet metal workshop, when sheet metal part is finished, QC department will assemble the metal parts and check size, edge,welding point,bending,integral assembly effect etc.

Step 2 Powder coating test

After panting,the painting group will check powder uniformity, surface flatness ,chromatic aberration etc. Unqualified parts will not have a chance to go to the next stage.

Step 3 Assembling before packing

After painting but before packing, QC department will assemble all the parts again to do the comprehensive inspection, including structure, size, accessories, color etc.

Step 4 Spot check in warehouse

Before loading, QC department will do the random inspection for the products in the warehouse, ensure the quality again before products leave factory.

  • Related Products
Two Drawers Filing Cabinet

Two Drawers Filing Cabinet

Two Drawers Cabinet

Two Drawers Cabinet

3 Drawers File Cabinet

3 Drawers File Cabinet

4 Drawers File Cabinet

4 Drawers File Cabinet

REQUIRED *

OPTIONAL