steel office furniture suppliers steel office furniture suppliers phone

PRODUCTS CENTER

Mini Safe Box

Model:CBNT-SF-17E


  • Size:W230*H170*D170mm
  • MOQ:30PCS
  • Packing Volume:0.014CBM
  • Thickness:Door 2.5mm & Body 1.5mm
  • Structure:Assembled
  • Raw Material:Cold Rolled Steel
  • Surface:Electrostatic Powder Coating
  • BUSINESS TYPE:B2B

  • Product Description
  • Accessories & Packing
  • QC System

Main Features

1. CE&ROHS Approved

2. High quality electronic lock : 3-8 digit user codes plus mechanical override keys

3. 2 Chrome plated solid steel locking bolts

4. Automatic locked for 5 minutes when 3 times fault password is input

5. Protective Floor Mat

6. 4 x AA batteries included, low battery warning

7. 4 pre-drilled anchor bolt holes, fixing kits supplied for anchoring to wall or floor, top opening for cash and coin

8. User manual included

9. Surface treatment: Powder coating against rust or corrosion

10. Two types: have hole on the top/ no hole on the top

11. 7 colors: white, black, red, gold, blue, pink, green

12. Door thickness:2.5mm // Body thickness:1.5mm

13.Usually load 1650pcs in 1X20GP


Application: Office,Home,Hotel etc
Delivery Time: 30days after payment
Thickness of painting: 60μm
Packing Method: Assembled structure,foam board,foam paper,standard 5 layers carton,packing straps
Warranty: 5 years

 

 

 
 
 

 

 

 

Main Technical Parameters

Size

W230*H170*D170mm

Structure

Assembled

Packing Volume

0.014cbm

Raw Material

Cold Rolled Steel

Thickness

Door 2.5mm & Body1.5mm

Surface

Electrostatic Powder Coating

MOQ

30pcs

Color Options

RAL,Pantone,Customized

MATERIALS AND COLOUR

PACKAGE

Step 1 Pre-assembling before painting

In the sheet metal workshop, when sheet metal part is finished, QC department will assemble the metal parts and check size, edge,welding point,bending,integral assembly effect etc.

Step 2 Powder coating test

After panting,the painting group will check powder uniformity, surface flatness ,chromatic aberration etc. Unqualified parts will not have a chance to go to the next stage.

Step 3 Assembling before packing

After painting but before packing, QC department will assemble all the parts again to do the comprehensive inspection, including structure, size, accessories, color etc.

Step 4 Spot check in warehouse

Before loading, QC department will do the random inspection for the products in the warehouse, ensure the quality again before products leave factory.

  • Related Products
Metal Four Doors Steel Metal Lockers For Staff

Metal Four Doors Steel Metal Lockers For Staff

3 Doors Locker

3 Doors Locker

5 compartments locker

5 compartments locker

3 Line 9 Doors Locker

3 Line 9 Doors Locker

REQUIRED *

OPTIONAL